It was a big day today, hired the concrete mixer and filled all of the blocks with concrete, only its called grout when its filling the blocks. It took about 1 cubic meter of concrete, which google tells me is 2.3 tonnes. I mixed it at the front, barrowed it up and around the back, and then put it in with a spade and a little funnel thing I came up with.
Next is to box up for the slab that goes on top, and which will hold up the pizza oven and BBQ, not too hard so should give a little time for the body to recover. I am feeling a little weary & sore tonight!